EICR codes explained: C1, C2, C3 and FI
Every observation on an Electrical Installation Condition Report gets a code. Here is what each one means, and how to explain it to a customer or landlord.
The four codes
| Code | Meaning | What happens next |
|---|---|---|
| C1 | Danger present. Risk of injury. | Immediate action. Make it safe before you leave, and tell the person responsible. |
| C2 | Potentially dangerous. | Urgent remedial work. |
| C3 | Improvement recommended. | Not a fault on its own. The report can still be satisfactory. |
| FI | Further investigation required without delay. | The inspector could not confirm whether there is a problem and needs to look further. |
Satisfactory or unsatisfactory?
An EICR is unsatisfactory if it records any C1, C2 or FI. C3 observations alone do not make it unsatisfactory. Say this clearly on the summary page, because it is the first thing a landlord, letting agent or insurer reads.
Landlords in England
Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, private landlords must have the electrics inspected and tested at least every five years. They must give a copy of the report to existing tenants within 28 days, and to new tenants before they move in. Where the report requires remedial work or further investigation, it must be done within 28 days, or sooner if the report says so, and the landlord must get written confirmation that it is complete.
Scotland and Wales have their own rules, so check which apply to the property.
Explaining codes to customers
- Write each observation in plain English as well as the regulation reference.
- Add a photo of each C1 and C2, so the customer can see the problem.
- Quote the remedial work at the same time, while the customer is paying attention.
Doing it on your phone
JobSense has EICR and Minor Works certificates built in. Observations, codes and photos go straight onto the certificate, and you can turn C1 and C2 items into a quote before you leave site. See how it all fits together in JobSense for electricians.
This guide is a summary. BS 7671 and the current IET guidance are the authority on coding.
Questions
What does C2 mean on an EICR?
C2 means potentially dangerous. Urgent remedial work is needed, and any C2 makes the report unsatisfactory.
Does a C3 make an EICR unsatisfactory?
No. C3 means improvement recommended. A report with only C3 observations can still be satisfactory.
How long does a landlord have to fix EICR issues in England?
28 days, or sooner if the report says so. The landlord must also get written confirmation that the work is complete and give it to the tenant and, if asked, the local council, within 28 days of the work.